PHD Enclosed Pin Clamp Design Eliminates Downtime
A large automotive manufacturer had an application utilizing vendor-supplied products prone to premature failure due to contamination (weld slag). The problem was so severe, the manufacturer assigned personnel to maintain the products. Every three days, maintenance cleaned the products to keep production running, resulting in additional overhead expenses, lost manpower, and production downtime. PHD’s Clamp...